SANA GROUP

Civil structural activities

Substructure part of project can be designed
by SANA or other consultants.

white arrow

triangle

 

Construction elements

 

Substructure part of project can be designed by SANA or other consultants. It will be executed using suitable formwork systems and with tested reinforced steel. All construction elements should be located using total station especially for anchor bolts to receive the steel structure. Finally, concrete casting will be mixed by machine mixers that give us good mixing and a perfectly required ratio.

triangle

 

Concrete production

 

Our Block factories support our projects as well as outside projects with best blocks in various sizes.

 

triangle

 

Formwork systems

 

Different types of formwork system provide project with speed, saving time and cost and to achieve excellent quality.

triangle

 

Structural Survey using Total station

 

Since we are dealing with steel structures, this means we are dealing with millimeters and very delicate measurements. The total station is basically a valuable assistant to our team on site

 

triangle

 

Quality Control

 

All works (formwork, reinforcement, anchor bolts and concrete mix) must be inspected before and after casting and concrete cubes are to be tested by high technology machine in our labs.

SANA GROUP

No 47 Adeniyi Jones,
Ikeja,
Lagos Nigeria

+234 902 600 0000

info@sanagroup.net

SANA GROUP

No 201 p3 Empire tower
Business bay, Dubai
UAE

SANA GROUP

Spintex Plaza
Floor-1, Office no-101
Plot no-133, Spintex Road
Accra, Ghana

+233 57 788 88 00

shadi.alghadban@sanagroup.net